Proven in the field.

Performance

Field validation · Spain

Deployments. Europe: Trials and demonstrations with major international airports, including Spain and France. Americas: Operational deployments in two U.S. airports, and demonstrations at major international airports in Latin America. GCC: Live demonstrations for military operators in the GCC. 20,000+ Km surveyed. 500+ Inspection hours. 12+ Sites since 2020.

Performance

Live demonstration · May 2025

Major Airport, France

10.7M passengers/year · 2 runways · 4,000 m main runway

Challenge
Evaluate FOD detection systems under live, wet-weather conditions
Deployment
MDU installed on the airport's own patrol vehicle in under 30 minutes
Environment
Live runway inspection, rain

Result

Planted FOD detected
10/10
False positive
1
Pebble detected at runway edge
<2 cm
Functionality maintained in rain
100%

Formal pilot · Dec 2023 – Jan 2024

Major Hub Airport, Spain

68M+ passengers/year · 4 runways · 5 terminals

Challenge
Validate against FAA AC 150/5220-24 across real operating conditions
Deployment
Airport personnel trained to operate the system directly
Environment
Day, night, dry, and wet

Result

Undetected FOD Reduction
50%
Vehicle installation
<30 min
Localization accuracy
99%
30–60 m width runway/taxiway coverage
100%

Operational validation · 2023–Present

Regional Aerodrome, Portugal

920 m runway

Challenge
Prove reliability under continuous day-to-day operator use
Deployment
Operated by airport personnel, three-plus years running
Environment
Ongoing field proving ground

“Based on the results of the trials and deployment carried out at our facility, we consider the MDU system to be a mature and reliable solution”

Aerodrome Director, January 2026

Timeline. From first deployment to daily operations. 2020: Program begins. First deployments and the start of continuous field validation. 2023: Two proving grounds open. A regional aerodrome in Portugal begins ongoing operational use; a major hub airport in Spain starts a formal pilot in December. 2024: Pilot concludes, validated. The hub airport pilot wraps in January, validated against FAA AC 150/5220-24 across day, night, dry, and wet conditions. 2025: Live demonstration, in the rain. A major airport in France runs a live demonstration in May: 10 of 10 planted FOD detected. 2026: 12+ sites, ongoing. Continuous operation and refinement with airport operators across Europe, the Americas, and the GCC.

Want results like these on your runway?

Book a demo